The Chancellor’s Announcement About Rural Broadband – Eventually You Get Proved Right

Yesterday the Chancellor of the Exchequer announced a further funding programme for rural broadband. This is designed to take faster internet connections deeper into the “difficult to reach” parts of the countryside.

There are two notable things about the proposed strategy here. The first is that it is based on what is called “full-fibre”. That means fibre optic cable right into the premises, not, as has mainly been the case to date, running fibre to street cabinets and then relying on the ancient copper cables to take the signal the rest of the way. This can be for miles in some rural areas, and the signal degrades over copper, whereas it doesn’t over fibre. Some of us have been calling for a “full-fibre” strategy for years, and, at last the Government has caught up with this, but only after wasting millions of pounds on propping up the antiquated copper telephone network.

The second notable element is that the new strategy is based around connecting up public sector buildings, especially schools, to the fibre network, and then connecting up the remainder of the community from there.

In 2011, redoubtable broadband activist Lindsey Annison had a plan identical to this to connect up the community of Warcop in Cumbria. Below are some videos I took on the Fibre Walk she led over the proposed cable-laying route. This plan could not be implemented because we were told that it was not feasible for schools to share the connections with non-educational sites. That policy has now been over-turned, but only 7 years later. How much time and money has been expended in pursuing temporary solutions till now?

It is good to be proved right, but why does it have to take so long?